34 FREEMAN'S BRIDGE RD.
Excavation and on-site thermal treatment of TSCA and non-TSCA PCB contaminated soil and debris.
|
|
|
ALLEN MILLS LOWER RACEWAY PCB SEDIMENT REMOVAL
Removal of PCB contaminated sediment and debris from the lower raceway. The raceway was set on the bottom of the mill, approximately 5’ below the Hudson River waterline.
|
|
|
AMERICAN THERMOSTAT ON-SITE LTTD SOIL TREATMENT
Excavate, pre-process, and thermally treat TCE and PCE contaminated soil for reuse on-site as backfill.
|
|
|
AUSABLE VALLEY CENTRAL SCHOOLS
Recycle existing asphalt pavement to produce a central plant mixed 4" binder course for paving of parking areas and entrance roads.
|
|
|
BASS RIVER MGP DREDGING
Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
|
|
|
BAY ROAD DUCK POND PCB SEDIMENT REMOVAL
Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel.
|
|
|
BBL EXIT 18 OFFICE BUILDING
Construction of a 66,000 sf. two story office building and related sitework for Tribune Media.
|
|
|
BENNINGTON CONNECTOR PROJECT C2, C3, C4, C6
Construct a new 3 lane highway for Route 7 in New York State to Route 67A in Vermont
|
|
|
BOUCHARD JUNKYARD PCB REMEDIATION
Excavation and off-site disposal of PCB contaminated soil located at a former automotive junkyard
|
|
|
BROOKFIELD POWER NEARSHORE DREDGING, SEDIMENT CAPPING AND RESTORATION
Removal of PCB contaminated sediment located along the shoreline.
|
|
|
BUTLER POND DAM
Construct a new impoundment overflow
spillway and outflow structure for a 70’
high dam at the century-old municipal reservoir.
|
|
|
CAMP SUMMIT DIOXIN REMEDIATION
Excavation and on-site consolidation of dioxin contaminated soil at an active correctional facility.
|
|
|
CASTLETON BRIDGE REHABILITATION
Repair the deteriorated concrete substructure. Repair/ replace deteriorated steel and inspection tram members. Upgrade the electrical system for the bridge lighting and tram. Paint portions of the structural steel.
|
|
|
CONSTRUCTION OF 145TH STREET BRIDGE SWING SPAN OVER THE HARLEM RIVER
The erection and transfer of the truss swing span for the 145th Street Bridge over the Harlem River. This movable bridge section was erected on land and loaded onto a barge in Coeymans, NY. The site of this swing span assembly was approximately 200 miles north of its final delivery location in New York City. The span was assembled, loaded onto barges, transported to site, and then floated into place.
|
|
|
COUNTY ROUTE 3 BRIDGE REPLACEMENT OVER CSX RAILROAD
Full bridge replacement to comply with CSX track clearance requirements.
|
|
|
CROSS STREET BRIDGE
Install a new road connecting VT routes 125 and 30 to US route 7, across the Otter Creek.
|
|
|
DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL
Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation.
|
|
|
EVEREADY BATTERY PLANT DECOMMISSIONING
Removal of lead contaminated equipment and building components from a lead plating assembly line.
|
|
|
F.W. OLIN CENTER FOUNDATION REPAIR
Due to foundation cracking and minor leaking in a 27 foot concrete block foundation backfill had to be removed and replaced with Geo Foam.
|
|
|
FORT EDWARD LANDFILL REMEDIATION & CONSTRUCTION OF ENGINEERED WETLANDS
Closure of a hazardous waste landfill including the nation’s first engineered wetlands system for leachate collection and treatment.
|
|
|
GE BLDG. 33/35 CUTOFF WALL
Installation of a 4,400 SF LNAPL cutoff wall.
|
|
|
GE LANDFILL NO.6 CLOSURE
Closure of hazardous waste landfill.
|
|
|
GE NEWELL ST. AREA II - PCB SOIL REMOVAL & CAPPING
Removal of TSCA and non-TSCA PCB contaminated soil and installation of a capping system.
|
|
|
GENESEE RIVER DREDGING CSX TRANSPORTATION
Removal of 3,000 cubic yards of solvent contaminated sediment and placement of subaqueous capping material.
|
|
|
GILBOA DAM SIPHONS AND DEBRIS BARRIER
Furnish and install protective features in preparation for dam anchoring contract.
|
|
|
GILBOA-PRATTSVILLE ROAD RECONSTRUCTION AND CULVERT REPLACEMENTS
4.7-miles of two-lane (one in each direction) road reconstruction consisting of paving, full depth replacement areas, underdrain, improvements cross-culverts, guiderail and striping.
|
|
|
GLENS FALLS ROUNDABOUT
Replace an existing five-way Intersection in the heart of downtown Glens Falls with a new Roundabout.
|
|
|
GLENVILLE BOAT LAUNCH
Provide site Development and installation of new boat launch facilities and fishing access on the Mohawk River
|
|
|
GREAT ESCAPE LODGE AND PEDESTRIAN BRIDGE
Construction of new parking lot for theme park with a connecting pedestrian bridge over NYS Route 9.
|
|
|
HADLEY 'BOW' BRIDGE
Rehabilitation of the Hadley ‘Bow’ bridge over the Sacandaga River, to allow unrestricted traffic loading, without sacrificing the historic appeal of this local landmark. This ‘lenticular’ truss bridge was built by the Berlin Iron Bridge Company in 1885 and is the only one like its kind still remaining in its original location. It was placed on the National Register of Historic Places on March 25, 1977.
|
|
|
HERRICK HOLLOW CREEK STREAM & WETLAND RESTORATION
Stream and wetland restoration of a 3,200' creek previously disturbed as part of a PCB remediation at a federal Superfund site.
|
|
|
HIGH LOAD WHARF CONSTRUCTION
Build a new high load wharf at the site of an existing port facility, which is located on the Hudson River
|
|
|
HUDSON RIVER PCB SEDIMENT REMOVAL GE - HUDSON FALLS PLANT
Removal of PCB contaminated sediment located along the shoreline and above the mill intake.
|
|
|
HUDSON RIVER SEDIMENT REMEDIATION PHASE 1 PROJECT
Site work for the construction of a dredged sediments processing facility.
|
|
|
I -87 EXIT 26 - 28
Rehab 12 miles of I-87
|
|
|
LIME KILN ROAD BRIDGE
Replacement of 1913 Concrete Arch Bridge
|
|
|
LUZERNE ROAD PCB SITE
Excavation and on-site thermal treatment of PCB contaminated soil. Off-site disposal of TSCA regulated soil and capacitors.
|
|
|
MILLENNIUM PIPELINE - MONGAUP / RIO RESERVOIR AREA IMPROVEMENTS
Construct a hiking trail and an eagle-viewing shelter
|
|
|
MINIMUM FLOW HYDROELECTRIC UNIT
Building a new minimum flow hydroelectric unit at the site of the existing Sherman Island Dam on the Hudson River (Hudson River Project FERC Project # 2482)
|
|
|
MOHAWK RIVER DREDGING
Removal of clean sediment deposition from uncontrolled erosion during upland site development. Corrective action under the jurisdiction of USACE and NYS DEC.
|
|
|
NATIONAL GRID SUBSTATION EXPANSIONS - SITE & FOUNDATION WORK
To clear, grade, pave, and install foundations, conduit, cable and grounding grids for electrical substation expansion.
|
|
|
NEWBURGH MGP SEDIMENT REMEDIATION
Environmental dredging of MGP impacted sediments from the Hudson River. Installation of a permanent sheetpile barrier wall and DNAPL collection trench.
|
|
|
NMPC CORINTH ROAD PCB SOIL REMEDIATION
Removal of PCB contaminated soils from Hudson River shoreline and Corinth Road subgrade.
|
|
|
NYPA GILBOA INTAKE CLEARING GILBOA HYDRO - LOW LEVEL INTAKE
Removal of debris partially blocking the low level intake for the emergency outlet tunnel.
|
|
|
ORU NYACK MGP UPPER TERRACE REMEDIATION
In-situ sediment solidification / stabilization coal tar impacted sediment. Excavation and disposal of upland impacted soils and MGP structures.
|
|
|
PLATTY KILL POND SOIL MIXING
In-situ sediment solidification/stabilization of 35,000 tons of oily soil, sludge, sediment and final capping of a ½ acre pond filled with oily sludge and sediment.
|
|
|
PORT OF ENTRY - CHAMPLAIN
Construction of a new processing facility at the
US - Canadian border.
|
|
|
REHABILITATION OF THE NORTH BRIDGE AT PEEBLES ISLAND STATE PARK
Rehabilitation of an historic railroad bridge that spans the Fifth Branch of the Mohawk River and the New York State Erie canal. This goal was to convert the existing bridge, which carried rail traffic and light vehicular traffic, to allow unrestricted vehicular traffic loading and a scenic pedestrian walkway. This conversion needed to be accomplished without sacrificing the historic appeal of this local landmark that sits at the confluence of the Mohawk and Hudson Rivers. This multiple span truss bridge was originally built by the American Bridge Company in the early 1900’s to provide railroad access to the island when it had a ship yard and manufacturing facility.
|
|
|
REPLACEMENT OF NYS ROUTE 9P OVER SARATOGA LAKE
Replacement of an existing bridge that spans the Saratoga Lake outlet. The goal of the project was to replace the existing narrow, structurally obsolete, 600’ long triple truss bridge. The replacement structure had wider traffic lanes, sidewalks on both sides, higher capacity and provided more clearance for boat traffic.
|
|
|
RETAINING WALL REPLACEMENT ALONG THE BASKET CREEK
Replace existing stone laid retaining wall with a post-and-concrete panel wall and reconstruction County Route 28.
|
|
|
RICHARDSON HILL ROAD LANDFILL - LANDFILL CAPPING AND STREAM RESTORATION
Storm water pollution controls, landfill capping (~7 acres), and stream / wetland restoration at a PCB Superfund site.
|
|
|
RODMAN LANDFILL
12 Acre Landfill Closure
|
|
|
ROUTE 12 BRIDGE, BETHEL
Replace the existing composite girder bridge with new multi span structure.
|
|
|
ROUTE 159 OVER THE CSX RAILROAD
Replacement of an existing steel thru-girder span with a pre-stressed post tensioned “Spahn Span” structure.
|
|
|
SAND CREEK AND POLLOCK ROAD
Replacement of four interstate highway structures on I-87 in the Town of Colonie.
|
|
|
SARATOGA COUNTY WATER TREATMENT AND TRANSMISSION FACILITIES
Construction of a water treatment plant to treat, store and transport water to municipalities and the Luther Forest Technology Park in Saratoga County.
|
|
|
SARATOGA RACINO BUILDING RENOVATION & EXPANSION
Fast-track subcontract services for Perini Building Co., Inc. & L.P. Ciminelli in Fall/Winter 2003 & 2006, respectively.
|
|
|
SCHOHARIE RESERVOIR BRIDGES
The replacement of two bridges in the Schoharie reservoir basin. Build both structures with minimal inconvenience to the traveling public and with minimal impact to the environmentally sensitive Schoharie watershed. This watershed is part of the New York City reservoir system.
|
|
|
SCHOOL ST. FALLS VIEW PARK
Construction of a recreational park and overlook to observe the Cohoes Falls.
|
|
|
SCHOOL STREET HYDROELECTRIC PLANT REHABILITATION & RELICENSING PROJECT
Construct an overlook park for the Cohoes Falls, build a fish bypass system and remove sediment from power canal for increased efficiency
|
|
|
SHANDAKEN TUNNEL INTAKE CHANNEL DREDGING & BAR RACK REPLACEMENT
Dredge sediment and remove debris from the Shandaken Intake Channel
|
|
|
SPA STEEL MGP REMEDIATION BARRIER WALL & CAP SYSTEM
Installation of a 300’ watertight barrier wall and geosynthetic cap system in downtown Saratoga Springs, New York.
|
|
|
ST.LAWRENCE RIVER REMEDIATION PROGRAM (SLRRP) - NEARSHORE EXCAVATION & SUBAQUEOUS CAPPING
Construction of a PCB and PAH subaqueous cap over 6 acres in the St. Lawrence River. Excavation and disposal of near-shore impacted sediments.
|
|
|
STORMWATER RETENTION POND REMEDIATION
Removal of over 1,500 CY of petroleum contaminated sediments from a cement plant retention pond. Upgrade of the pond layout to provide future oil spill prevention.
|
|
|
TARRYTOWN MGP REMEDIATION DESIGN-BUILD REDEVELOPMENT
Multi-phased design-build contract with marine and land based MGP remediation on the Hudson River.
|
|
|
THE ALEXANDER AT WASHINGTON AVENUE
Site development and construction of concrete foundations for apartment project with parking garage.
|
|
|
TROY AREA 2 MGP AIR PLENUM DECOMMISSIONING & DEMOLITION
Cleanout and decommissioning of a former coke oven air plenum tunnel system.
|
|
|
TROY AREA 4 MGP REMEDIATION NIAGARA MOHAWK
Three year project involving the removal of coal tar and the installation of a cap system over a six (6) acre MGP disposal site located on the shore of the Hudson River.
|
|
|
UALBANY NANOFAB CLEANROOM EXCAVATION, PILINGS AND UTILITIES
Perform fast-track subcontract services for M+W Zander in order to construct a cleanroom facility within a 30,000-square footprint.
|
|
|
WARD PRODUCTS - STREAM SEDIMENT REMOVAL
Removal of over 2,650 tons of heavy metal contaminated sediments from four stream locations (Mohawk River/Quist Road, East Branch, West Branch, and Sam Stratton Road).
|
|
|
WATERVLIET ARSENAL
Rehabilitation of existing Sludge-Drying Beds.
|
|
|
WIDEWATER COMMONS
Site development for a 74 acre retail center involving site drainage, soil remediation, clearing, site paving, site concrete and major earth work.
|