34 FREEMAN'S BRIDGE RD.
Excavation and on-site thermal treatment of TSCA and non-TSCA PCB contaminated soil and debris.
|
|
|
ALLEN MILLS LOWER RACEWAY PCB SEDIMENT REMOVAL
Removal of PCB contaminated sediment and debris from the lower raceway. The raceway was set on the bottom of the mill, approximately 5’ below the Hudson River waterline.
|
|
|
AMERICAN THERMOSTAT ON-SITE LTTD SOIL TREATMENT
Excavate, pre-process, and thermally treat TCE and PCE contaminated soil for reuse on-site as backfill.
|
|
|
AUSABLE VALLEY CENTRAL SCHOOLS
Recycle existing asphalt pavement to produce a central plant mixed 4" binder course for paving of parking areas and entrance roads.
|
|
|
BASS RIVER MGP DREDGING
Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
|
|
|
BAY ROAD DUCK POND PCB SEDIMENT REMOVAL
Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel.
|
|
|
BBL EXIT 18 OFFICE BUILDING
Construction of a 66,000 sf. two story office building and related sitework for Tribune Media
|
|
|
BOUCHARD JUNKYARD PCB REMEDIATION
Excavation and off-site disposal of PCB contaminated soil located at a former automotive junkyard
|
|
|
BUTLER POND DAM
Construct a new impoundment overflow
spillway and outflow structure for a 70’
high dam at the century-old municipal reservoir.
|
|
|
CAMP SUMMIT DIOXIN REMEDIATION
Excavation and on-site consolidation of dioxin contaminated soil at an active correctional facility.
|
|
|
COUNTY ROUTE 3 BRIDGE REPLACEMENT OVER CSX RAILROAD
Full bridge replacement to comply with CSX track clearance requirements.
|
|
|
DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL
Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation.
|
|
|
EVEREADY BATTERY PLANT DECOMMISSIONING
Removal of lead contaminated equipment and building components from a lead plating assembly line.
|
|
|
FORT EDWARD LANDFILL REMEDIATION & CONSTRUCTION OF ENGINEERED WETLANDS
Closure of a hazardous waste landfill including the nation’s first engineered wetlands system for leachate collection and treatment.
|
|
|
GE BLDG. 33/35 CUTOFF WALL
Installation of a 4,400 SF LNAPL cutoff wall.
|
|
|
GE LANDFILL NO.6 CLOSURE
Closure of hazardous waste landfill.
|
|
|
GILBOA DAM SIPHONS AND DEBRIS BARRIER
Furnish and install protective features in preparation for dam anchoring contract.
|
|
|
GILBOA-PRATTSVILLE ROAD RECONSTRUCTION AND CULVERT REPLACEMENTS
4.7-miles of two-lane (one in each direction) road reconstruction consisting of paving, full depth replacement areas, underdrain, improvements cross-culverts, guiderail and striping.
|
|
|
GLENS FALLS ROUNDABOUT
Replace an existing five-way Intersection in the heart of downtown Glens Falls with a new Roundabout
|
|
|
GLENVILLE BOAT LAUNCH
Provide site Development and installation of new boat launch facilities and fishing access on the Mohawk River
|
|
|
|
GREAT ESCAPE LODGE AND PEDESTRIAN BRIDGE
Construction of new parking lot for theme park with a connecting pedestrian bridge over NYS
Route 9.
|
|
|
HADLEY 'BOW' BRIDGE
Rehabilitation of the Hadley ‘Bow’ bridge over the Sacandaga River, to allow unrestricted traffic loading, without sacrificing the historic appeal of this local landmark. This ‘lenticular’ truss bridge was built by the Berlin Iron Bridge Company in 1885 and is the only one like its kind still remaining in its original location. It was placed on the National Register of Historic Places on March 25, 1977.
|
|
|
I -87 EXIT 26 - 28
Rehab 12 miles of I-87
|
|
|
LIME KILN ROAD BRIDGE
Replacement of 1913 Concrete Arch Bridge
|
|
|
MILLENNIUM PIPELINE - MONGAUP / RIO RESERVOIR AREA IMPROVEMENTS
Construct a hiking trail and an eagle-viewing shelter
|
|
|
MINIMUM FLOW HYDROELECTRIC UNIT
Building a new minimum flow hydroelectric unit at the site of the existing Sherman Island Dam on the Hudson River (Hudson River Project FERC Project # 2482)
|
|
|
|
MOHAWK RIVER DREDGING
Removal of clean sediment deposition from uncontrolled erosion during upland site development. Corrective action under the jurisdiction of USACE and NYS DEC.
|
|
|
PORT OF ENTRY - CHAMPLAIN
Construction of a new processing facility at the
US - Canadian border.
|
|
|
RETAINING WALL REPLACEMENT ALONG THE BASKET CREEK
Replace existing stone laid retaining wall with a post-and-concrete panel wall and reconstruction County Route 28.
|
|
|
|
RODMAN LANDFILL
12 Acre Landfill Closure
|
|
|
SARATOGA COUNTY WATER TREATMENT AND TRANSMISSION FACILITIES
Construction of a water treatment plant to treat, store and transport water to municipalities and the Luther Forest Technology Park in Saratoga County.
|
|
|
SARATOGA RACINO BUILDING RENOVATION & EXPANSION
Fast-track subcontract services for Perini Building Co., Inc. & L.P. Ciminelli in Fall/Winter 2003 & 2006, respectively.
|
|
|
SCHOOL ST. FALLS VIEW PARK
Construction of a recreational park and overlook to observe the Cohoes Falls.
|
|
|
SHANDAKEN TUNNEL INTAKE CHANNEL DREDGING & BAR RACK REPLACEMENT
D Dredge sediment and remove debris from Shandaken Tunnel Intake Channel
|
|
|
|
SOUTH BAY BRIDGE
Upgrade power lines crossing the southern end of Lake Champlain
|
|
|
|
THE ALEXANDER AT WASHINGTON AVENUE
Site development and construction of concrete foundations for apartment project with parking garage.
|
|
|
UALBANY NANOFAB CLEANROOM EXCAVATION, PILINGS AND UTILITIES
Perform fast-track subcontract services for M+W Zander in order to construct a cleanroom facility within a 30,000-square footprint.
|
|
|
|
WATERVLIET ARSENAL
Rehabilitation of existing Sludge-Drying Beds
|