Water Treatment
Recent Projects
|
34 FREEMAN'S BRIDGE RD. Excavation and on-site thermal treatment of TSCA and non-TSCA PCB contaminated soil and debris. Read more about this project |
|
|
BAY ROAD DUCK POND PCB SEDIMENT REMOVAL Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel. Read more about this project |
|
|
BOUCHARD JUNKYARD PCB REMEDIATION Excavation and off-site disposal of PCB contaminated soil located at a former automotive junkyard Read more about this project |
|
|
CAMP SUMMIT DIOXIN REMEDIATION Excavation and on-site consolidation of dioxin contaminated soil at an active correctional facility. Read more about this project |
|
|
DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation. Read more about this project |
|
EVEREADY BATTERY PLANT DECOMMISSIONING Removal of lead contaminated equipment and building components from a lead plating assembly line.
Read more about this project |









