Recent Projects

BASS RIVER MGP DREDGING
Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
 
Read more about this project

BAY ROAD DUCK POND PCB SEDIMENT REMOVAL
Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel.
 
Read more about this project

DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL
Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation.
Read more about this project

GE BLDG. 33/35 CUTOFF WALL
Installation of a 4,400 SF LNAPL cutoff wall.
 
Read more about this project

PLATTY KILL POND SOIL MIXING
In-situ sediment solidification/stabilization of 35,000 tons of oily soil, sludge, sediment and final capping of a ½ acre pond filled with oily sludge and sediment.