Stabilization / Solidification, Containment (Slurry Walls)
Recent Projects
|
|
BASS RIVER MGP DREDGING Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
|
|
|
BAY ROAD DUCK POND PCB SEDIMENT REMOVAL Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel. Read more about this project |
|
|
DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation. Read more about this project |
|
|
GE BLDG. 33/35 CUTOFF WALL Installation of a 4,400 SF LNAPL cutoff wall.
|
|
|
PLATTY KILL POND SOIL MIXING In-situ sediment solidification/stabilization of 35,000 tons of oily soil, sludge, sediment and final capping of a ½ acre pond filled with oily sludge and sediment. Read more about this project |