PCB Site Clean-up
Recent Projects
|
34 FREEMAN'S BRIDGE RD. Excavation and on-site thermal treatment of TSCA and non-TSCA PCB contaminated soil and debris. Read more about this project |
|
ALLEN MILLS LOWER RACEWAY PCB SEDIMENT REMOVAL Removal of PCB contaminated sediment and debris from the lower raceway. The raceway was set on the bottom of the mill, approximately 5’ below the Hudson River waterline. Read more about this project |
|
|
BAY ROAD DUCK POND PCB SEDIMENT REMOVAL Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel. Read more about this project |
|
|
BOUCHARD JUNKYARD PCB REMEDIATION Excavation and off-site disposal of PCB contaminated soil located at a former automotive junkyard Read more about this project |
|
|
DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation. Read more about this project |
|
|
GE BLDG. 33/35 CUTOFF WALL Installation of a 4,400 SF LNAPL cutoff wall.
|