Marine & Wetland

Recent Projects

GLENVILLE BOAT LAUNCH
Provide site Development and installation of new boat launch facilities and fishing access on the Mohawk River
Read more about this project

BUTLER POND DAM
Construct a new impoundment overflow
spillway and outflow structure for a 70’
high dam at the century-old municipal reservoir.
Read more about this project

GILBOA DAM SIPHONS AND DEBRIS BARRIER
Furnish and install protective features in preparation for dam anchoring contract.
 
Read more about this project

BASS RIVER MGP DREDGING
Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
 
Read more about this project

BAY ROAD DUCK POND PCB SEDIMENT REMOVAL
Stream diversion and removal of PCB contaminated sediments from the pond bottom and channel.
 
Read more about this project

BOUCHARD JUNKYARD PCB REMEDIATION
Excavation and off-site disposal of PCB contaminated soil located at a former automotive junkyard
 
Read more about this project

DEWEY LOEFFEL - T11A TRIBUTARY PCB SEDIMENT REMOVAL
Removal of over 1,200 tons of PCB contaminated sediments from a tributary stream. Ecological preservation required innovative methods to remove fine grained sediments from the streambed without stripping the area of morphological features such as larger stone, natural contours, and bank vegetation.
Read more about this project

FORT EDWARD LANDFILL REMEDIATION & CONSTRUCTION OF ENGINEERED WETLANDS
Closure of a hazardous waste landfill including the nation’s first engineered wetlands system for leachate collection and treatment.
Read more about this project

GE BLDG. 33/35 CUTOFF WALL
Installation of a 4,400 SF LNAPL cutoff wall.
 
Read more about this project

I -87 EXIT 26 - 28
Rehab 12 miles of I-87
 
Read more about this project

GREAT ESCAPE LODGE AND PEDESTRIAN BRIDGE
Construction of new parking lot for theme park with a connecting pedestrian bridge over NYS Route 9.
Read more about this project

RETAINING WALL REPLACEMENT ALONG THE BASKET CREEK
Replace existing stone laid retaining wall with a post-and-concrete panel wall and reconstruction County Route 28.
Read more about this project

SCHOOL ST. FALLS VIEW PARK
Construction of a recreational park and overlook to observe the Cohoes Falls.
 
Read more about this project

HADLEY 'BOW' BRIDGE
Rehabilitation of the Hadley ‘Bow’ bridge over the Sacandaga River, to allow unrestricted traffic loading, without sacrificing the historic appeal of this local landmark. This ‘lenticular’ truss bridge was built by the Berlin Iron Bridge Company in 1885 and is the only one like its kind still remaining in its original location. It was placed on the National Register of Historic Places on March 25, 1977.
Read more about this project

MINIMUM FLOW HYDROELECTRIC UNIT
Building a new minimum flow hydroelectric unit at the site of the existing Sherman Island Dam on the Hudson River (Hudson River Project FERC Project # 2482)
 
Read more about this project

MOHAWK RIVER DREDGING
Removal of clean sediment deposition from uncontrolled erosion during upland site development. Corrective action under the jurisdiction of USACE and NYS DEC.
 
Read more about this project

GILBOA-PRATTSVILLE ROAD RECONSTRUCTION AND CULVERT REPLACEMENTS
4.7-miles of two-lane (one in each direction) road reconstruction consisting of paving, full depth replacement areas, underdrain, improvements cross-culverts, guiderail and striping.
Read more about this project