MGP Site Clean-up

Recent Projects

ALLEN MILLS LOWER RACEWAY PCB SEDIMENT REMOVAL
Removal of PCB contaminated sediment and debris from the lower raceway. The raceway was set on the bottom of the mill, approximately 5’ below the Hudson River waterline.
Read more about this project

BASS RIVER MGP DREDGING
Dredging of coal tar contaminated sediments and installation of a subaqueous cap and scour mat system.
 
Read more about this project

ORU NYACK MGP UPPER TERRACE REMEDIATION
In-situ sediment solidification / stabilization coal tar impacted sediment. Excavation and disposal of upland impacted soils and MGP structures.
Read more about this project

SPA STEEL MGP REMEDIATION BARRIER WALL & CAP SYSTEM
Installation of a 300’ watertight barrier wall and geosynthetic cap system in downtown Saratoga Springs, New York.
Read more about this project

TROY AREA 4 MGP REMEDIATION NIAGARA MOHAWK
Three year project involving the removal of coal tar and the installation of a cap system over a six (6) acre MGP disposal site located on the shore of the Hudson River.
Read more about this project