Asphalt & Concrete Paving
Recent Projects
|
|
LIME KILN ROAD BRIDGE Replacement of 1913 Concrete Arch Bridge
|
|
|
GLENVILLE BOAT LAUNCH Provide site Development and installation of new boat launch facilities and fishing access on the Mohawk River Read more about this project |
|
FORT EDWARD LANDFILL REMEDIATION & CONSTRUCTION OF ENGINEERED WETLANDS Closure of a hazardous waste landfill including the nation’s first engineered wetlands system for leachate collection and treatment.
Read more about this project |
|
|
AUSABLE VALLEY CENTRAL SCHOOLS Recycle existing asphalt pavement to produce a central plant mixed 4" binder course for paving of parking areas and entrance roads.
Read more about this project |
|
PORT OF ENTRY - CHAMPLAIN Construction of a new processing facility at the US - Canadian border. |
|
|
THE ALEXANDER AT WASHINGTON AVENUE Site development and construction of concrete foundations for apartment project with parking garage.
Read more about this project |
|
WATERVLIET ARSENAL Rehabilitation of existing Sludge-Drying Beds.
Read more about this project |
|
SARATOGA COUNTY WATER TREATMENT AND TRANSMISSION FACILITIES
Construction of a water treatment plant to treat, store and transport water to municipalities and the Luther Forest Technology Park in Saratoga County.
Read more about this project |
|
|
I -87 EXIT 26 - 28 Rehab 12 miles of I-87
|
|
|
GREAT ESCAPE LODGE AND PEDESTRIAN BRIDGE Construction of new parking lot for theme park with a connecting pedestrian bridge over NYS Route 9.
Read more about this project |
|
GLENS FALLS ROUNDABOUT Replace an existing five-way Intersection in the heart of downtown Glens Falls with a new Roundabout.
Read more about this project |
|
|
BBL EXIT 18 OFFICE BUILDING Construction of a 66,000 sf. two story office building and related sitework for Tribune Media.
Read more about this project |
|
|
RETAINING WALL REPLACEMENT ALONG THE BASKET CREEK
Replace existing stone laid retaining wall with a post-and-concrete panel wall and reconstruction County Route 28.
Read more about this project |
|
GILBOA-PRATTSVILLE ROAD RECONSTRUCTION AND CULVERT REPLACEMENTS 4.7-miles of two-lane (one in each direction) road reconstruction consisting of paving, full depth replacement areas, underdrain, improvements cross-culverts, guiderail and striping. Read more about this project |













