Asphalt & Concrete Paving

Recent Projects

LIME KILN ROAD BRIDGE
Replacement of 1913 Concrete Arch Bridge
 
Read more about this project

GLENVILLE BOAT LAUNCH
Provide site Development and installation of new boat launch facilities and fishing access on the Mohawk River
Read more about this project

FORT EDWARD LANDFILL REMEDIATION & CONSTRUCTION OF ENGINEERED WETLANDS
Closure of a hazardous waste landfill including the nation’s first engineered wetlands system for leachate collection and treatment.
Read more about this project

AUSABLE VALLEY CENTRAL SCHOOLS
Recycle existing asphalt pavement to produce a central plant mixed 4" binder course for paving of parking areas and entrance roads.
Read more about this project

PORT OF ENTRY - CHAMPLAIN

Construction of a new processing facility at the

US - Canadian border. 
Read more about this project


THE ALEXANDER AT WASHINGTON AVENUE
Site development and construction of concrete foundations for apartment project with parking garage.
Read more about this project

WATERVLIET ARSENAL
Rehabilitation of existing Sludge-Drying Beds.
Read more about this project

SARATOGA COUNTY WATER TREATMENT AND TRANSMISSION FACILITIES
Construction of a water treatment plant to treat, store and transport water to municipalities and the Luther Forest Technology Park in Saratoga County.
Read more about this project

I -87 EXIT 26 - 28
Rehab 12 miles of I-87
 
Read more about this project

GREAT ESCAPE LODGE AND PEDESTRIAN BRIDGE
Construction of new parking lot for theme park with a connecting pedestrian bridge over NYS Route 9.
Read more about this project

GLENS FALLS ROUNDABOUT
Replace an existing five-way Intersection in the heart of downtown Glens Falls with a new Roundabout.
Read more about this project

BBL EXIT 18 OFFICE BUILDING
Construction of a 66,000 sf.  two story office building and related sitework for Tribune Media.
Read more about this project

RETAINING WALL REPLACEMENT ALONG THE BASKET CREEK
Replace existing stone laid retaining wall with a post-and-concrete panel wall and reconstruction County Route 28.
Read more about this project

GILBOA-PRATTSVILLE ROAD RECONSTRUCTION AND CULVERT REPLACEMENTS
4.7-miles of two-lane (one in each direction) road reconstruction consisting of paving, full depth replacement areas, underdrain, improvements cross-culverts, guiderail and striping.
Read more about this project
Kubricky Construction Jointa Galusha Environmental Soil Management, Inc. VPP D.A. Collins